TIF Thessaloniki International Fair 2024Products & Services IBB16® - The leading method for pressure pipe rehabilitation
IBB16® - The leading method for pressure pipe rehabilitation
- No diameter limitation DN 150 - 2.000
- No cooling with ice is necessary
- No working pressure restriction (16 bar | higher pressure on request), despite the lowest wall thickness compared to the competition)
- Standard installation length is 300 mtr
- Up to 450 mtr possible depending on diameter
Further reading - No cooling with ice is necessary
- No working pressure restriction (16 bar | higher pressure on request), despite the lowest wall thickness compared to the competition)
- Standard installation length is 300 mtr
- Up to 450 mtr possible depending on diameter
The leading method for trenchless pressure pipe rehabilitation